OSHA 10 Hour Construction Program Practice Test

Disable ads (and more) with a membership for a one time $2.99 payment

Prepare for the OSHA 10 Hour Construction Program Exam with comprehensive quizzes, flashcards, and multiple choice questions. Enhance your understanding with hints and explanations to ensure you are well-prepared. Ace your exam with confidence!

Practice this question and more.


What is the purpose of conducting an engineering survey before demolition work begins?

  1. To assess the cost of the project

  2. To determine the layout of the site

  3. To prevent premature collapse of the structure

  4. To evaluate potential hazards

The correct answer is: To prevent premature collapse of the structure

Conducting an engineering survey before demolition work begins is crucial for identifying and mitigating risks associated with the collapse of structures. The survey allows engineers and safety professionals to assess the integrity of the existing building and understand how it might behave during demolition activities. By analyzing the structural components and load distribution, the survey helps to pinpoint areas that may be at risk of premature collapse. This ensures that safe demolition methods can be employed, helping to protect workers and the surrounding environment from potential accidents. While evaluating potential hazards and determining the layout of the site are also important aspects of the overall safety plan for demolition, the primary focus of the engineering survey is to provide insights that prevent uncontrollable structural failure. Understanding the state of the existing building is essential for planning effective demolition strategies and ensuring safety throughout the process.